Latest news
![](https://www.nordicenergy.org/wordpress/wp-content/uploads/2024/10/Brosjyre-GreenTransport-Skjerm_page-0001.jpg)
Six new recommendations for a green transport sector
![](https://www.nordicenergy.org/wordpress/wp-content/uploads/2024/09/Eirill-Mehammer.png)
Hydrogen from green surplus energy to isolated areas for sea and land-based transport
The project is a study of an electrolysis plant for hydrogen production from green surplus electricity. The electrolysis plant is described in detail, and its operation in an isolated power grid is investigated.
Duration: 2022–2023
Funding: 1 000 000 DKK
Project owner: Nordic Atlantic Cooperation (NORA), Faroe Islands
Programme Administration
Ditte Stiler
Adviser
View full profile